|
![]() Recent Projects. Bedroom En-Suite. Completed (May 07, 2007) This project is to strip out existing en-suite and renew including sound proofing existing timber stud walls.
We have stripped off all existing plaster hollow walls and below you can see that we have started filling the voids with 50mm soundproofing quilt.
![]() All existing plaster walls are being stripped off and renewed.
![]() We have now renewed existing ceiling and skimmed it ready for electrical lights to be fitted.
![]() We have now fitted new IP rated shower room electical low voltage spot lights into the ceiling.
![]() Looking at the light in the left hand corner is an intergrated shower type extractor fan which is activated with the lights and connected to a timer.
![]() Below you can see the new shower tray being fitted. This tray is one of the largest type available being 1400x800mm.
![]() We have now tiles all the walls.
![]() Grouting of the tiles has just been completed. We let the grout set and dry for two days prior to any cleaning.
![]() ![]() ![]() ![]() This project is completed
More pictures to follow soon!!!! Click here to return to the Recent Projects page
Powered by Create |