Extension Kitchen and internal alterations. (Jarrow) (May 15, 2006)
This project involves partial demolition of existing kitchen extension and rebuilding to current Building Regulations Standards.  Removal of existing internal load bearing walls to make existing dinning room and kitchen as one.
 
jar1140
 
jar1142
 
 
jar1143
 
jar1144
 
 
Below is pic as existing.  Where single door is we will be fitting steel lintels and removing walls which will lead into new kitchen area.
jar1155
 
jar1156
 
To the right of the kitchen extension you can see where we are fitting new lintels to fit french doors.
 
jar1157
 
We have now removed all existing ceilings and dividing walls making the dinning room and kitchen as one.  Here you can see the start of the ceiling being fitting with fire rate ceilnig boards, giving a 1/2 hour fire protection to the 1st floor.
 
jar1177
 
If you look to the right you can see that we have now fitted the steel lintels and removed the walls leading into the kitchen area.
 
jar1178
 
jar1179
 
The roof has now been fitted to the kitche extension and soon all the external walls will be waterproof rendered.
 
jar1182
 
Here we have cut out the existing chimney breast which at a later date our clients will be fitting a range cooker in.
jar1184
Lintels have been fitted and we are now waiting to remove existing window, cut out wall and fit new french doors.
jar1186
 
We have now removed the existing window and fitted new
french doors.  Start of internal plastering.
 
jar1198
 
jar1199
 
jar1201
 
jar1203
 
jar 1208
 
jar 1209
 
Inside of this existing chimney opening, our client is fitting a new electric style fire.
 
jar 1210
 
Here you can see that we have left water feeds and waist in the middle of the floor. Our client is fitting a island kitchen consisting of sink and cupboards.
 
Also our client is fitting a new range oven inside the large kitchen chinmey opening which we have formed.  This full area will be fitted out with a new kitchen which will cover the existing area of which the combi boiler is fitted.
 
jar 1211
 
jar 1212
 
jar 1213
 
jar 1214
 
Our client will be painting the external render once dry.
 
jar 1216
 
jar 1217
 
jar 1218
 
 
Letter Received.
 
Dear Graeme,
 
I would like to thank you for the work which your company has completed on my property.  I am very grateful and 100% satisfied with the end result.
I will be employing you again in the near future for further works required on the roof.
 
Thanks
 
Dave
 
This project is now completed.