Drainage Works Completed. (September 17, 2009)
The old owners of this property fitted an new en-suite to the master bedroom approximately 10 years ago.  Unfortunately all the main drain runs are along the other side of the house and therefore a pumped Saniflow was used.

The new owners are currently upgrading the property and therefore required an extension to the drains so that the en-suite will drain into the main drains.

pl2426

Excavation works have started.  To prevent damage to the grounds we have decided to dig the trenches by hand.

pl2428

The trenches have been dug and the new drainage pipes laid on pipe bedding gravel.

pl2432

Building Regulations require an inspection chamber at any bend, this which will allow easy access to rod the drains should a blockage occur.
(Inspection chamber is the black object).


pl2433

pl2436

This picture shows the new pipes fully covered in pipe bedding.
By totally covering the pipes with gravel, this prevents any stones, rock or sharp items breaking the pipe when the trench is backfilled.

pl2438

All the trenches have been backfilled and compacted.

pl2443

pl2588

pl2592

pl2587

This project is now fully complete.  It is now very difficult to see where the trenches were dug.


Letter Received with Payment.

(Original Copy available for inspection).
18.09.2008.

Dear Graeme,

Please find enclosed cheque for the amount of £xxx in settlement of the works completed at my home.

I wish to confirm that I am delighted with the job and the professionalism your company showed throughout.

I would have no hesitation recommending you in the future.

Yours Sincerely.

Mr Lancaster.

Enc....